Perencanaan Implementasi Double Roller Press Pada Silo Semen Untuk Pengoptimalan Proses Operasional Packing Plant
Abstract
Abstract: The company PT Solusi Bangun Andalas Tbk, especially the Lhoknga Plant, has the final area responsible for cement sales, namely the Packing Plant. There are two packers that operate with the aim of packing, cement is tamped in silos which are filled by the Cement Mill. In the operational process, there is equipment that is damaged and works less than optimally and causing the cement in the silo to not be extracted, if the cement in the silo is left too long or not extracted, the cement will turn into a coating. Of course, this can hamper the operational process. With a tool capable of destroying existing coatings in a solo company, it will be even more optimal in the operational process both in terms of cost and time.
Full Text:
PDFReferences
HYNG0602-Cement silo, “Data Cement Silo”.
SAI-QS-QC-12 Karakteristik Material Lhoknga Plant “Data lab Lhoknga Plant” Holcim. Manual Book Cement Silo. Lhoknga, PT Holcim Indonesia.
Khurmi, J. G. R.S. 2005. A Textbook of Machine Design (S.I. Units). Ram Nagar, New Delhi-110 055: Eurasia Publishing House (PVT.) LTD.
Fischer, U., Heinzler, M., Naher, F., and Paetzold, H. "Mechanical and Metal Trade Handbook." Germany: VERLAG EUROPA LEHRMITTEL, 2006.
Mobley, R. Keith. (2001). Plant Engineer's Handbook. Melbourne New Delhi.
Deutschman, Aaron D., 1975, Machine Design: Theory and Practice. New York: Macmillan Publishing Co, Inc.
Shygley, Joseph E, 1986. Perencanaan Teknik Mesin jilid 1 & 2, Erlangga.
Jakarta.
Jac. Stolk, C. Kros. Alih bahasa H. Abdul Rachman A. 1984. Elemen-Elemen Mesin, edisi 2. Erlangga. Jakarta.
Refbacks
- There are currently no refbacks.