Analisis Perbandingan Metode Beton Site-mix dengan Beton Ready-mix

agus bambang siswanto, M Afif Salim, Aulia Firman N

Abstract


In Indonesia, construction projects still use on site concrete or manual concrete (Site-Mix), but since the establishment of a company that produces ready-mix concrete, users of ready-mix concrete have started to be recognized for the various advantages it offers. It is necessary to research which one is more effective and efficient.

The research was conducted in the Integrated Dormitory Development Project at Madrasah Aliyah Negeri 2 Kudus with a research focus on calculating tools based on AHSP districts Kudus and the contractor's Time Schedule used on the project. The work that is calculated includes the concrete used in structural work. The purpose of this research is to make comparisons terms of costs for each method. Find the advantages and disadvantages of each method.

The analysis technique in this study begins with determining the volume of concrete requirements based on the contractor's time schedule, then multiplied by the coefficient in the analysis of the unit price of the work in Kudus Regency. So that we find the cost for each.

Through the analysis of the research results, there are several conclusions, namely that the ready-mix concrete working method is cheaper. While the site-mix concrete work method is more expensive. This project is price difference Rp79,622,437 or 11% efficiency from price site mix concrete


Keywords


site mix, ready mix, beton

Full Text:

PDF

References


A Luthan Putri Lynna & Syafriandi, 2006, Aplikasi Microsoft Project Untuk Penjadwalan Teknik Sipil. Andi Offset, Yogyakarta.

Antoni, Paul Nugraha, 2007, Teknologi Beton. Andi Offset, Yogyakarta.

Dinas Pekerjaan Umum dan Tata Ruang, 2020, Analisa Harga Satuan Pekerjaan (AHSP). Kudus

Heizer, Jay dan Barry Reder. 2009. Manajemen Operasi. Salemba Empat : Jakarta

Husen, Abrar. 2009. Manajemen Proyek. Edisi Revisi. Andi Offset, Jogjakarta.

Ibrahim, H.Bachtiar. 1993. Rencana Dan Estimate Real Of Cost.Cetakan ke-2.Jakarta : Bumi Aksara.

Larson, E. W., & Gray, C., 2006, Manajemen Proyek - Proses Manajerial. C.V Andi Offset :Yogyakarta

Lasa HS. 2009. Kamus Kepustakawanan Indonesia. Yogyakarta: Pustaka Book Publisher.

Mulyono, 2006. Teknologi Beton. Andi offist: Yogyakarta

Nurhayati ,2010. Manajemen Proyek. Graha Ilmu : Jogjakarta.

Siswanto, Agus B, M Afif Salim, 2019, Manajemen Proyek, Pilar Nusantara, Semarang

Sugiyono.,2013, Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.

Tjokrodimuljo, K., 2007, Teknologi Beton. Biro Penerbit Keluarga Mahasiswa Teknik Sipil Universitas Gadjah Mada, Yogyakarta.

Winoto, Agnes Dwi Yanthi, 2014, Manejemen Kontruksi Untuk Bangunan .PT. Taka Publisher: Jogjakarta




DOI: https://doi.org/10.30601/jtsu.v7i2.1898

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 agus bambang siswanto

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019