Analisis Eskalasi pada Proyek Multiyears (Studi Kasus Pembangunan Pengendalian Kerusakan Longsoran Tebing Sungai Lawe Alas Kabupaten Aceh Tenggara)

Muhammad Ridha, Amalia Effendy, Muhammad Irfan

Abstract


The purpose of the study is to analyze the value of the price escalation of the work item for the Damage Control (Avalanche) Development Project for the Lawe Alas River Cliff, Southeast Aceh Regency. The result of the escalation calculation based on the contract value in the 13th month is Rp. 53,048.010,455, of the total contract value of Rp. 104,415,0005,000, or an escalated value of 50.80% of the contract price. Escalation calculation method used the formula contained in Presidential Decree no. 16 of 2018 article 37, with quantity data obtained from field measurements and stated in the final addendum terms and contracts. The component index is obtained from the relevant ministerial decree and the price index from the Central Statistics Agency (BPS). The calculation is done by looking at the progress and delays in the schedule. From the calculation, the Escalation Value obtained is Rp. 708,990,794 with a percentage of 1.34% of the escalation contract value, which is Rp. 53,048.010,455. The escalation percentage obtained at 1.34% was still able to offset the inflation that occurred at 1.28%.


Keywords


multi years project, escalation, component index, price index, inflation

Full Text:

PDF

References


Peraturan Presiden Republik Indonesia (2018) No. 16 Tentang Pengadaan Barang/Jasa Pemerintahan.

Badan Pusat Statistik (2018), Indeks Harga Perdagangan Besar Indonesia "The Wholesale Price Indices of Indonesia"

Badan Pusat Statistik (2018), Indeks Harga Konsumen 82 Kota di Indonesia "Consumer Price Indices of 82 Cities In Indonesia"

Badan Pusat Statistik (2019), Indeks Harga Perdagangan Besar Indonesia "The Wholesale Price Indices of Indonesia"

Badan Pusat Statistik (2019), Indeks Harga Konsumen 82 Kota di Indonesia "Consumer Price Indices of 82 Cities In Indonesia"

Riyadi,dkk. (2017). Analisis Eskalasi Biaya (Penyesuaian Harga) pada Kontrak Multi Years (studi Kasus : Proyek Pembangunan Jembatan Kelinjau II Kabuaten Kutai Timur Kalimantan Timur). Jurnal Teknik Sipil Fakultas Teknik Universitas Brawijaya.

Fatoni,dkk. (2016). Analisis Eskalasi Biaya pada Proyek Infrastruktur Tahun Jamak (Studi Kasus Proyek Pembangunan Waduk Jatigede dan Proyek Pembangunan Waduk Jatibarang . Jurnal Teknik Sipil Fakultas Teknik Universitas Diponegoro.

Silvia, R., Syahputra, I., & Ridha, M. (2019). Analisa Stabilitas Tebing Dengan Menggunakan Metode Bishop Berbasis Program Rocscience Slide Versi 6.020. Prosiding SEMDI-UNAYA (Seminar Nasional Multi Disiplin Ilmu UNAYA), 489–495.




DOI: https://doi.org/10.30601/jtsu.v8i1.2624

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Muhammad Ridha, Amalia Effendy, Muhammad Irfan

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019