[1]
“PERENCANAAN SISTEM PEMBANGKIT LISTRIK TENAGA SAMPAH KAPASITAS 1000 WATT DENGAN PROSES INSINERASI”, SEMDI-UNAYA, vol. 1, no. 1, pp. 212–222, Nov. 2017, Accessed: Oct. 17, 2026. Available: https://jurnal.abulyatama.ac.id/index.php/semdiunaya/article/view/204