Analisis Kinerja Ruas Jalan Mata Ie Aceh Besar
DOI:
https://doi.org/10.30601/jtsu.v12i1.6949Keywords:
PKJI 2023, Road Performance, Side Obstacles, Degree of SaturationAbstract
For Lambheu Keutapang Village, Darul Imarah District, Mata Ie Road is one of the arterial road segments that passes through Lambheu Keutapang Village, Darul Imarah District, Aceh Besar Regency and is a road that connects Aceh Besar Regency and Banda Aceh City. However, in reality there are several local activities that occur, one of the activities that most affects the performance of the road section is the traditional market. The purpose of this study was to determine the performance of the Mata Ie Road section, especially in front of Keutapang Market, Aceh Besar, and to determine the impact of Keutapang Market on Mata Ie Road traffic based on side obstacles.The methodology used in this study is the Traffic Volume Survey with the PKJI 2023 method and survey data analysis with the PKJI 2023 method. Based on the results of the survey data analysis, the following results were obtained: The highest traffic volume on Wednesday, July 3, 2024 was 1486 Skr/hour at 17.00-18.00. while the lowest traffic volume occurred at 10.00-11.00 at 1142 Skr/hour, The highest side obstacles on Monday occurred at 17.00-18.00 at 394.79 incidents/hour while the lowest side obstacles occurred on Monday at 179.07 incidents/hour at 13.00-14.00 still at a moderate level. The degree of saturation on Sunday reached 0.66. On Monday the degree of saturation reached 0.62, and on Wednesday the degree of saturation reached 0.67 Indicating the level of road service according to PKJI is classified as level of service C The flow is stable, but the speed of the vehicle is controlled and the driver is limited in choosing the speed.Downloads
Published
2026-02-18
Issue
Section
Artikel
License
Proposed Policy for Journals That Offer Open Access Authors who publish with Jurnal Teknik Sipil Unaya agree to the following terms: a. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal. b. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal. c. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).How to Cite
Analisis Kinerja Ruas Jalan Mata Ie Aceh Besar. (2026). Jurnal Teknik Sipil Unaya, 12(1), 46-55. https://doi.org/10.30601/jtsu.v12i1.6949