HUBUNGAN ANTARA PRODUKTIVITAS PEKERJA GALANGAN DAN TEKNIK KERJA TERHADAP KINERJA GRAVING DOCK (STUDI KASUS DI PT. JANATA MARINA INDAH SEMARANG)
DOI:
https://doi.org/10.30601/jtsu.v1i2.16Abstrak
Shipyard industry is one of the most important chain on the national shipping system. Notably to maintains the vessels condition in order to get adjustment of The Indonesia Classification Bureaustandard. Shipyard’s productivity depends on the graving dock capacity, man productivity and work method. Empirical studies show that man competiveness and productivity and effective work method are primary factors which affects choice rate from shipping companies to a shipyard. The research goal was to analyzed the effect of man productivity and work method toward graving dock performance in PT. Janata Marina Indah Semarang. Multiple linear regression used as a method in this research. Methodology use basic is difficulty to identify relating directly from man productivity and work method toward graving dock performance. The sampling method using purposive random sampling with 35 respondents who have long experience in the graving dock works. The result of regression analysis is: Y= -0,357 + 0,256 X1 + 0,249 X2. The result shows that two factors both man productivity and work method, are have significant effect toward graving dock performance.Referensi
Amrozi, Ahmad Hari. 2007. Faktor – Faktor Yang Mempengaruhi Kinerja Pemeliharan Jembatan. Tesis Magister Teknik Sipil Unissula Semarang.
Aslesen, Sigmund, and Svein Erik Moen. (2012). Communication in the Manufacturing Industry : An Empirical Study of the Management of Engineering Drawing in a Shipyard International Journal of Productivity Management and Assessment Technologies (IJPMAT) 1 (4) 22-40.
Bertram, V. (2003). Strategic control of productivity and other competitiveness parameters Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment, 217(2), 61-70.
Biro Klasifikasi Indonesia.(2003) Register 2003. Jakarta
Bruce, G. J. (2006). A Review Of The Use Of Compensated Gross Tonnes For Shipbuilding Performance Measurement. Journal of Ship Production, 22(2), 99-104.
Caridis, Piero. (2001). Inspection, Repair and Maintenance Ship Structures Part B. London : Witherby Publishers.
Farhum, St. Aisyah. (2010). Kajian Stabilitas Empat Tipe Kasko Kapal Pole and Line. Jurnal Ilmu dan Teknologi Kelautan Tropis, 02 (02), 53-61.
First Marine International. (2005). Findings For The Global Shilbuilding Industrial Base Benchmarking Study. Report of Secretary of Defense United States of America.
Gebhardt, L. P., & Jarvis, R. G. (2003). Productivity Improvement at the SENESCO Shipyard. Journal of Ship Production, 19(3), 187-193.
Ghozali, Imam. (2006). Aplikasi Analisis Multi Variate dengan Program SPSS, Semarang: BP-UNDIP
Hasan, M. Iqbal. (2002). Pokok-pokok Materi Metodologi Penelitian dan Aplikasinya. Jakarta: Ghalia Indonesia.
House, David John. (2003). Dry Docking and ShipBoard Maintenance. London : Whitherby Publishers.
Huda, Miftahul. (2006). Keseimbangan Gaya Hidrostatis Uplift dan Beban Kontra Sebagai Pengganti Tiang Pancang Pada Bangunan Graving dock. Jurnal Aksial, 08 (02), 68-75.
Koenig, P. C., Narita, H., & Baba, K. (2003). Shipbuilding productivity rates of change in East Asia. Journal of ship production, 19(1), 32-37.
König, M., Beißert, U., Steinhauer, D., & Bargstädt, H. J. (2007, September). Constraint-based Simulation Of Outfitting Processes In Shipbuilding And Civil Engineering. In Proceedings of the 6th EUROSIM Congress on Modeling and Simulation.
Krishnan, S. Navaneetha. (2012) A Scientific Approach to Measure Shipbuilding Productivity. Maritime Affairs: Journal of the National Maritime Foundation of India 8.(1) 136-149.
Lamb, T., Gray, W., Colton, T., Comer, J., & Cahill, P. D. (2001). World-class Shipbuilders: Their Productivity Using Lean-Manufacturing Principles. Discussion. Author's Closure. Transactions-Society of Naval Architects and Marine Engineers, 109, 285-308.
______., & Hellesoy, A. (2002). A shipbuilding Productivity Predictor. Journal of Ship Production, 18(2), 79-85.
______., Chung, H., Spicknall, M., Shin, J. G., Woo, J. H., & Koenig, P. (2006). Simulation-based Performance Improvement For Shipbuilding Processes. Journal of Ship Production, 22(2), 49-65.
Lee, D. K., Shin, J. G., Kim, Y., & Jeong, Y. K. (2014). Simulation-Based Work Plan Verification in Shipyards. Journal of Ship Production and Design.
Moyst, H., & Das, B. (2005). Factors Affecting Ship Design And Construction Lead Time And Cost. Journal of Ship Production, 21(3), 186-194.
Pires Jr, F. C., & Lamb, T. (2008). Establishing performance targets for shipbuilding policies. Maritime Policy & Management, 35(5), 491-502.
Reksohadiprodjo, Sukanto dan Indriyo Gitosudarmo. (2000). Manajemen Produksi Edisi 4. Jogjakarta: BPFE UGM.
Roland, F., Manzon, L., Kujala, P., Brede, M., & Weitzenbock, J. (2004). Advanced joining techniques in European shipbuilding. Journal of Ship Production, 20(3), 200-210.
Shin, J. G., & Sohn, S. J. (2000). Simulation-based Evaluation Of Productivity For The Design Of An Automated Fabrication Workshop In Shipbuilding. Journal of Ship Production, 16(1), 46-59.
Soegiono dkk. (1984). Kamus Istilah Teknik Kapal edisi II. FTK ITS Surabaya.
Soejitno. (1999). Teknik Reparasi Kapal. Jurusan Teknik Perkapalan ITS Surabaya.
Sugiyono. (2005). Statistik Untuk Penelitian, Bandung : Alva Beta.