[1]
2023. PENERAPAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG ISOLASI RSUD MEURAXA KOTA BANDA ACEH MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM). Jurnal Teknik Sipil Unaya. 9, 2 (Agu 2023), 147–155. DOI:https://doi.org/10.30601/jtsu.v9i2.4013.