[1]
2019. Analisis Anggaran Biaya dan Waktu Optimal dengan Metode Least Cost Sheduling. Jurnal Teknik Sipil Unaya. 4, 2 (Mar 2019), 71–78. DOI:https://doi.org/10.30601/jtsu.v4i2.35.