“PENERAPAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG ISOLASI RSUD MEURAXA KOTA BANDA ACEH MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM)”. 2023. Jurnal Teknik Sipil Unaya 9 (2): 147-55. https://doi.org/10.30601/jtsu.v9i2.4013.