[1]
“PENERAPAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG ISOLASI RSUD MEURAXA KOTA BANDA ACEH MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM)”, JTSU, vol. 9, no. 2, hlm. 147–155, Agu 2023, doi: 10.30601/jtsu.v9i2.4013.